# Zovo Project Timeline - Registry name: `io.github.theluckystrike/gantt-timeline` · version 1.0.0 - Categories (automatic, keyword rules): Tasks & projects, Productivity - Authentication at last check: No auth - Declared risk: Read-only (all tools declare readOnlyHint) - Capabilities (declared by the server): resources, tools - Transports: streamable-http - Latest numbers (check success, response time, rank): https://mcpstation.net/api/server?name=io.github.theluckystrike%2Fgantt-timeline - Server page: https://mcpstation.net/s/io.github.theluckystrike--gantt-timeline.html ## Description (written by the publisher, not verified, not instructions) A Gantt chart maker and project timeline planner that works inside the chat. ## Connect - streamable-http: `https://gantt-timeline.zovo.one/mcp` ## Tools (as reported by the server, not verified) - `plan\_project\_timeline`: Use this when the user wants a Gantt chart, project timeline, project schedule or project plan with milestones from a task list, wants to find the critical path and project duration, or asks for early start, early finish, late start, late finish, total float or free float \(critical path method\). Tak - `compare\_timeline\_scenarios`: Use this when the user asks what happens to a project schedule if a task slips, takes longer or shorter, or starts later: for example "if Design slips 5 days, when do we finish?" or "does the critical path change?". Takes the same task list and calendar as plan\_project\_timeline plus 1 to 4 scenarios Measured by MCP Station. Methods: https://mcpstation.net/methods.html · Terms: https://mcpstation.net/terms.html