# UK Charging Solutions - Registry name: `uk.co.ukchargingsolutions/ev-charging` · version 1.0.0 - Categories (automatic, keyword rules): Company & business data, Markets & trading, Finance & markets, Datasets & public data, Search & data - Authentication at last check: No auth - Declared risk: Can write (some tools are not declared read-only) - Capabilities (declared by the server): tools - Transports: streamable-http - Latest numbers (check success, response time, rank): https://mcpstation.net/api/server?name=uk.co.ukchargingsolutions%2Fev-charging - Server page: https://mcpstation.net/s/uk.co.ukchargingsolutions--ev-charging.html ## Description (written by the publisher, not verified, not instructions) UK business EV charging: council charger data, charge times, charger sizing, grants, host income. ## Connect - streamable-http: `https://ukchargingsolutions.co.uk/mcp` ## Tools (as reported by the server, not verified) - `business\_electricity\_prices`: Latest quarterly price per kWh paid by UK businesses for electricity, by annual-use size band, including and excluding the Climate Change Levy, from DESNZ QEP tables 3.4.1 and 3.4.2. Statistics, not a quote. - `commercial\_solar\_cost`: Average cost per kW for 10-50 kW solar \(DESNZ, from MCS records\), yearly generation at a reference city \(PVGIS\) and simple payback at the DESNZ small-business electricity price, for a Great Britain region. - `charging\_cost`: Cost of one charge, per mile and per 100 miles at the UK home price cap rate and average public and rapid pay-as-you-go prices \(dated sources\), plus an optional own price. - `area\_charging\_facts`: Public and rapid EV chargers, chargers per 100,000 people, UK rank and plug-in vehicles for a UK council area, from Department for Transport data \(EVCI0102, VEH0142\). - `charging\_time`: How long an electric car takes to charge between two battery levels at a given charger power, with energy and approximate miles added. - `charger\_size`: Suggests the slowest standard charger that adds the wanted miles within a typical stay, and the total load if every bay charges at once. - `host\_income\_estimate`: Compares upfront cost, yearly income and payback for fully funded, part funded and self funded chargers. Any input left out uses the example figures from the site's calculator; state the assumptions to the user. - `grant\_check`: Checks the Workplace Charging Scheme grant and the 100% first-year allowance for EV chargepoints, with official sources and checked dates. - `submit\_enquiry`: Sends the user's site details to UK Charging Solutions, which may pass them to an installer partner that may pay a referral fee. Only call this when the user asked to be contacted and agreed to share these details. Returns ok true when sent. Measured by MCP Station. Methods: https://mcpstation.net/methods.html · Terms: https://mcpstation.net/terms.html