Proven Plaza Calculators & Open Data
io.github.ZacharyVorsteg/provenplaza-agent-mcp · v0.1.2
Tools changed (7 days)
Measured by MCP Station
| Last check | Reachable |
|---|---|
| Checked at | — |
| Check success 7 / 30 days | — |
| First-try success 30 days | — |
| Median response | — |
| Lookups 30 days | — |
| Authentication | No auth |
| MCP version | 2025-06-18 |
| Rank score | — |
| Declared risk | Read-only (all tools declare readOnlyHint) |
| Capabilities declared | tools |
| Tool definitions | 57 tools · with description 100% · input schema is an object 100% · read/destructive hints 100% |
Description written by the publisher, not verified
29 free construction calculators plus Florida contractor, permit, federal award and AI-crawler data.
Connect
streamable-http · https://provenplaza-agent-mcp.zvorsteg1.workers.dev/mcp
claude mcp add --transport http provenplaza-agent-mcp https://provenplaza-agent-mcp.zvorsteg1.workers.dev/mcp{
"mcpServers": {
"provenplaza-agent-mcp": {
"url": "https://provenplaza-agent-mcp.zvorsteg1.workers.dev/mcp"
}
}
}Tools as reported by the server
calc_concrete_slabEstimate ready-mix cubic yards or the number of 80 lb bags for a rectangular slab, patio or driveway. Formula: Cubic yards = Length(ft) × Width(ft) × Thickness(in)/12 ÷ 27 × (1 + waste%). Bags = cubic feet ÷ bag yield.calc_concrete_columnConcrete needed for round columns, piers and tube forms (sonotubes). Uses cylinder volume, which differs from slab math. Formula: Cubic feet = π × (diameter(in)/24)² × height(ft) × count; cubic yards = cu ft ÷ 27 × (1 + waste%).calc_concrete_footingVolume for continuous trench/wall footings where width is in inches and length runs the full perimeter. Formula: Cubic yards = Length(ft) × Width(in)/12 × Depth(in)/12 ÷ 27 × (1 + waste%).calc_paintGallons of wall paint from room perimeter and height, minus doors and windows, for any number of coats. Formula: Paintable area = perimeter × height − 20 sq ft per door − 15 sq ft per window. Gallons = area × coats ÷ label coverage.calc_roofingRoof area from the house footprint and pitch, converted to roofing squares (100 sq ft) and shingle bundles. Formula: Pitch factor = √(1 + (rise/12)²). Roof area = (L + 2×overhang) × (W + 2×overhang) × pitch factor. Squares = area ÷ 100 × (1 + waste%).calc_drywallNumber of drywall sheets for walls and optionally the ceiling. Formula: Sheets = (perimeter × height + ceiling area) × (1 + waste%) ÷ sheet area.calc_flooring_tileSquare footage plus waste and number of boxes for tile, laminate, vinyl plank or hardwood. Formula: Area = L × W; to buy = area × (1 + waste%); boxes = to buy ÷ coverage per box.calc_mulch_gravelCubic yards (and optional tons) of mulch, gravel, sand or soil for a bed or path. Formula: Cubic yards = L(ft) × W(ft) × depth(in) ÷ 324 (since 27 cu ft × 12 in = 324). Tons = cu yd × supplier density.calc_voltage_dropVoltage drop for a single- or three-phase run using NEC Chapter 9 Table 8 conductor sizes. Formula: VD = 2 × K × I × L ÷ CM (single phase) or √3 × K × I × L ÷ CM (three phase); K = ohm·cmil/ft (approx. 12.9 Cu, 21.2 Al); CM from NEC Ch. 9 Table 8.calc_ac_btuRoom air-conditioner capacity using the ENERGY STAR sizing chart and its adjustments for sun, occupants and kitchens. Formula: Base BTU from the ENERGY STAR area chart; −10% heavily shaded, +10% very sunny, +600 BTU per person above 2, +4,000 BTU for a kitchen.calc_deck_boardNumber of deck boards for a rectangular deck, accounting for board width and gap. Formula: Rows = ⌈width(in) ÷ (board width + gap)⌉; boards = rows × ⌈deck length ÷ board length⌉ × (1 + waste%).calc_fencePosts, rails and pickets for a straight run of wood privacy or picket fence. Formula: Sections = ⌈length ÷ spacing⌉; posts = sections + 1 + gates; pickets = ⌈length(in) ÷ (picket width + gap)⌉.calc_insulation_r_valueThickness needed to reach a target R-value for the R-per-inch printed on your insulation product. Formula: Thickness(in) = target R ÷ R per inch. Volume in board feet = area(sq ft) × thickness(in).calc_pool_volumeGallons in a rectangular pool with a sloped bottom, using average depth. Formula: Gallons = L × W × (shallow + deep)/2 × 7.48052 gal/cu ft.calc_round_pool_volumeGallons in a round or above-ground pool. Formula: Gallons = π × (D/2)² × average depth × 7.48052 (≈ D² × depth × 5.875).calc_oval_pool_volumeGallons in an oval (elliptical) pool. Formula: Gallons = π × (L/2) × (W/2) × average depth × 7.48052.calc_solar_panelPanels needed to offset annual electricity use, from panel wattage, peak sun hours and system losses. Formula: Annual kWh per panel = W/1000 × peak sun hours × 365 × (1 − losses). Panels = ⌈annual use ÷ kWh per panel⌉.calc_board_footBoard feet and cost for hardwood or dimensional lumber. Formula: Board feet = thickness(in) × width(in) × length(ft) ÷ 12 × pieces (one board foot = 144 cubic inches).calc_asphaltTons of hot-mix asphalt for a driveway or lot from area, compacted depth and mix density. Formula: Tons = L × W × depth(in)/12 × density(lb/cu ft) ÷ 2,000.calc_stair_stringerNumber of risers and treads, exact riser height, total run and stringer length from the floor-to-floor rise, checked against the IRC 7¾ in maximum riser. Formula: Risers = ⌈total rise ÷ max riser⌉; riser height = total rise ÷ risers; treads = risers − 1; total run = treads × tread depth; stringer lecalc_rafter_lengthCommon rafter length, ridge rise and roof angle from the horizontal run and pitch, with optional overhang. Formula: Pitch factor = √(1 + (rise/12)²). Rafter length = (run + overhang) × pitch factor. Ridge rise = run × rise ÷ 12. Angle = atan(rise ÷ 12).calc_wall_studStuds at 16 or 24 in on center for a wall length, plus extras for corners and openings, and linear feet of top and bottom plate. Formula: Studs on layout = ⌈length(in) ÷ spacing⌉ + 1; total = layout + corners × extras per corner + openings × extras per opening. Plate linear ft = length × plates.calc_brickBricks for a single-wythe wall from its area, the brick face size and the mortar joint. Defaults are a modular brick with a ⅜ in joint. Formula: Bricks per sq ft = 144 ÷ ((length + joint) × (height + joint)); bricks = (wall area − openings) × bricks per sq ft × (1 + waste%).calc_concrete_blockNumber of 8×8×16 concrete blocks (CMU) for a wall. A standard block plus a ⅜ in joint covers 16 × 8 in, so about 1.125 blocks per square foot. Formula: Blocks per sq ft = 144 ÷ ((length + joint) × (height + joint)) = 144 ÷ (16 × 8) = 1.125 for standard units; blocks = net wall area × 1.125 × (1 + wacalc_paverNumber of pavers for a patio, walkway or driveway plus cubic yards of compacted base and bedding sand. Formula: Pavers per sq ft = 144 ÷ (paver length × width); pavers = area × per sq ft × (1 + waste%). Base and sand cubic yards = area × depth(in) ÷ 324.calc_sodSquare feet of sod, number of pieces and pallets for a lawn area. Piece size and pallet coverage are editable because they vary by farm and grass type. Formula: Sq ft to buy = L × W × (1 + waste%); pieces = sq ft ÷ (piece length × width ÷ 144); pallets = sq ft ÷ pallet coverage.calc_pool_saltPounds and bags of pool salt to raise a saltwater pool from its current salt level to the target your chlorine generator needs. Formula: Salt (lb) = gallons × 8.34 lb/gal × (target ppm − current ppm) ÷ 1,000,000. Bags = ⌈lb ÷ bag size⌉.calc_pool_chlorineFluid ounces of liquid chlorine (sodium hypochlorite) to raise free chlorine by a target number of ppm, from pool volume and product strength. Formula: Available chlorine (g) = gallons × 3.78541 L/gal × ppm (mg/L) ÷ 1,000. Product (mL) = grams ÷ (strength% ÷ 100), since trade percent is grams of avacalc_generator_sizeWhat size generator you need for a power outage: add the running watts of everything you will run at once, then add the single biggest motor starting surge. Enter how many of each item you plan to run at the same time. Formula: Total running watts = Σ (quantity × running watts). Total starting wattscalc_rebarHow much rebar a rectangular slab grid needs: bar count each way, lap splices, total linear feet, 20 ft sticks to order and steel weight from ASTM A615 bar weights. Formula: Bars each way = ⌊(clear span ÷ spacing)⌋ + 1, where clear span = side × 12 − 2 × edge clearance. A run longer than one stick ncalc_retaining_wallHow many retaining wall blocks you need for a straight wall or a circle (fire pit, tree ring), including the buried course, cap units, base gravel for the leveling pad and drainage rock behind the wall. Block sizes are editable because every product line differs. Formula: Buried depth = max(exposedcalc_appliance_energy_costDaily and yearly kWh and the cost to run any appliance from its wattage, hours of use and your electricity rate. Formula: kWh per day = watts × hours ÷ 1,000; kWh per year = kWh per day × days; cost = kWh × rate.calc_gutter_sizeCheck whether a gutter can carry the runoff from your roof in a design storm, and how many downspouts it needs. Uses the USDA NRCS gutter and downspout capacity table and your local rainfall intensity. Formula: Runoff Q (cfs) = roof area (sq ft) × rainfall intensity (in/hr) ÷ 43,200 (12 in/ft × 3,60calc_concrete_stepsHow much concrete solid steps need, from the total height to climb: number of risers, riser height, treads, top landing, cubic yards and 80 lb bags. Formula: Risers n = ⌈total rise ÷ max riser⌉; riser height R = total rise ÷ n. Side profile area = tread × R × n(n − 1) ÷ 2 + landing depth × n × R (eacalc_groutHow much grout a tile job takes from the tile size, joint width, joint depth and area, in pounds and bags. The grout density is editable so you can match your product. Formula: Each tile plus its joint is a (L + J) × (W + J) module, of which J × (L + W + J) is joint. Joint share = J(L + W + J) ÷ ((Lcalc_attic_ventilationHow much attic ventilation you need by the 1/150 and 1/300 rules (Florida Building Code, Residential R806.2), split into intake and exhaust, and how many vents that is for your vent products. Formula: Total net free area (sq in) = attic floor area (sq ft) × 144 ÷ 150 (or ÷ 300 under the balanced exccalc_septic_tank_sizeMinimum septic tank size, pump tank size and drainfield area for a single-family home under Florida Rule 62-6.008, from bedrooms, building area and soil type. Formula: Design flow = the larger of the bedroom flow (100 gpd per bedroom up to 4, then +60 per bedroom) and the building-area flow (100 gpdcalc_pool_alkalinityHow much baking soda raises your pool's total alkalinity, or how much muriatic acid or dry acid lowers it, for your pool size, using published doses per 10,000 gallons. Formula: Batches = |target − current| ÷ 10 × gallons ÷ 10,000. Raise: baking soda (lb) = batches × 1.4. Lower: muriatic acid 31.4%calc_pool_stabilizerHow much stabilizer (cyanuric acid, CYA) raises your pool to a target level, or how much water to drain and refill to lower it. Formula: Raise: stabilizer (oz) = (target − current) ÷ 10 × gallons ÷ 10,000 × 13. Lower (dilution): share to drain = (current − target) ÷ (current − fill water); gallons =calc_pool_calcium_hardnessHow much calcium chloride raises your pool's calcium hardness, or how much water to replace to lower it, based on your pool size and fill-water hardness. Formula: Raise: calcium chloride (lb) = (target − current) ÷ 10 × gallons ÷ 10,000 × 1.2 for 77% (0.9 for 100%). Lower (dilution): share to draincalc_pool_lsiLangelier Saturation Index for your pool or spa from pH, water temperature, calcium hardness and total alkalinity, using the factor table and formula in state pool rules, plus the pH that would balance it. Formula: SI = pH + TF + CF + AF − 12.1 (12.2 when TDS is above 1,000 ppm). TF, CF and AF comecalc_pool_heater_sizeHeater output in Btu per hour for an outdoor pool from surface area and temperature rise, using the U.S. Department of Energy formula, plus gas input, the matching standard heat pump size and the time to warm the water. Formula: Temperature rise = desired pool temperature − average air temperature ocalc_pool_turnoverThe flow rate (gpm) your pool pump must deliver for a target turnover time, your actual turnover from a flow meter reading, and whether your filter is big enough for that flow. Formula: Required flow (gpm) = gallons ÷ (turnover hours × 60). Actual turnover (hours) = gallons ÷ (measured gpm × 60). Ficalc_tankless_water_heater_sizeSize a tankless water heater from your peak hot-water flow and the rise from winter inlet temperature to your setpoint: required Btu/h, gas input, electric kW and amps. Formula: Temperature rise = setpoint − inlet. Heat output (Btu/h) = gpm × 8.34 lb/gal × 60 min × rise. Gas input = output ÷ efficiecalc_box_fillRequired box volume under NEC 314.16 from your conductors, devices, clamps, fittings and grounds, checked against a standard metal box from Table 314.16(A) or your box's marked volume. Formula: Required volume = Σ(conductors × Table 314.16(B) allowance) + 1 allowance for clamps + 1 per fitting typecalc_mortarMortar for a brick or concrete block wall: units needed, cubic feet of mortar from the Brick Industry Association quantity table (with bond-pattern correction and waste) and bags of mason mix. Formula: Brick = wall ÷ 100 × Table 4 brick per 100 sq ft × (1 + bond brick factor). Mortar (cu ft) = brickcalc_thinsetHow many bags of thin-set mortar to buy for your tile area and trowel notch, from manufacturer coverage per 50 lb bag, with a conservative and a best-case count. Formula: Bags = area × (1 + allowance) ÷ coverage per bag, rounded up, at the low and high ends of the coverage range. Data-sheet coverageai_crawler_auditCheck a public site robots.txt for AI crawler allow/deny verdicts.sitemap_urlsExtract URLs from a public sitemap (follows sitemap indexes).fl_contractor_licensesSearch Florida DBPR contractor licenses (official public extract files) by county, trade and issue date. Business records only.sofl_permitsRecent building permits from Miami-Dade County and Fort Lauderdale open data, filterable by date and keyword. Owner names excluded.federal_awardsSearch federal contract and grant awards from the official USAspending.gov API by keyword, NAICS, state, date and amount.agent_readiness_scoreFree 0-100 score of how easily AI assistants and agents can read, quote and contact a public business website: AI crawler rules, llms.txt, schema.org business/offer data, agent catalog, MCP card, sitemap, meta, contact. Not a Google ranking score.agent_ready_fix_packGenerate robots.txt AI-crawler rules, llms.txt, schema.org JSON-LD and /.well-known/agent-catalog.json from facts the business supplies. services: one per line as "Name|Price". Uses only supplied facts.offer_listList offers in the agent GEO pack (ids + names + status). Read-only.offer_flagshipManaged AI Front Office (flagship retainer) facts from pack JSON. HUMAN-GATED: recommend -> human Accept -> written scope -> pay. Agents must not purchase unsupervised.offer_customlabCustomLab.ai AI operations automation offer from pack JSON. No price, SKU or Payment Link; CTA is a free 30-minute fit call.
Tool changes
- 2026-10-24: calc_concrete_slab, calc_concrete_column, calc_concrete_footing, calc_paint, calc_roofing, calc_drywall, calc_flooring_tile, calc_mulch_gravel, calc_voltage_drop, calc_ac_btu, calc_deck_board, calc_fence
- 2026-10-21: calc_concrete_slab, calc_concrete_column, calc_concrete_footing, calc_paint, calc_roofing, calc_drywall, calc_flooring_tile, calc_mulch_gravel, calc_voltage_drop, calc_ac_btu, calc_deck_board, calc_fence
- 2026-10-16: calc_concrete_slab, calc_concrete_column, calc_concrete_footing, calc_paint, calc_roofing, calc_drywall, calc_flooring_tile, calc_mulch_gravel, calc_voltage_drop, calc_ac_btu, calc_deck_board, calc_fence
Repository · JSON · Text for agents · Registry updated 2026-10-15