All servers · Security
us.artificl/liftlog
us.artificl/liftlog · v1.0.0
Measured by MCP Station
| Last check | Reachable |
|---|---|
| Checked at | — |
| Check success 7 / 30 days | — |
| First-try success 30 days | — |
| Median response | — |
| Lookups 30 days | — |
| Authentication | No auth |
| MCP version | 2025-06-18 |
| Rank score | — |
| Declared risk | Not declared (tools carry no read/destructive hints) |
| Capabilities declared | tools |
| Tool definitions | 5 tools · with description 100% · input schema is an object 100% · read/destructive hints 0% |
Description written by the publisher, not verified
Forklift & aerial-lift compliance records for warehouses — read-only demo tools.
Connect
streamable-http · https://liftlog.artificl.us/mcp
claude mcp add --transport http liftlog https://liftlog.artificl.us/mcp{
"mcpServers": {
"liftlog": {
"url": "https://liftlog.artificl.us/mcp"
}
}
}Tools as reported by the server
search_requirementsSearch lift compliance requirements by operator name, machine, or requirement type. Returns matching records with next due date and status.list_citable_itemsList overdue or missing compliance items — the ones that would be citable in an OSHA inspection or damaging in an injury investigation. Most serious first.get_requirements_dueList operator evaluations, inspections, and maintenance intervals due within the next N days (default 30).get_lift_summaryGet the lift compliance summary: totals for tracked requirements, not done, overdue and citable, due this week, and awaiting records.export_lift_logExport the full lift compliance log as CSV text (operator or machine, requirement, next due, status, chase history).
Website · JSON · Text for agents · Registry updated 2026-08-10